Home
About us
Quality Policy
Accessories
Products
Enquiry
Contact us

1. We are developing automatic structural painting machines by Barcare which covers 10,000 Sq.ft/Coat/Day*
2. Barcare India is developing pressure roller coating machine for super finishing painting of wall surfaces.
3. Barcare India will establish a brand new manufacturing plant for structural painting equipments and accessories division at Coimbatore, India by Joint venture with Barcare china by 2011.

 
 
MOBILE:
+91 80150 56561 / 94433 63302
E-mail:
hbt@barcareindia.com
 
 
 
   
  1. GENERAL
  All deliveries and services from and by HBT shall be governed exclusively by the following terms and condition and no deviations from these conditions, except those accepted in writing, shall be bringing on HBT. It is clearly understood that, by placing am order with us, the customer is deemed.
 
  • To have accepted our conditions and
  • To have waived off their conditions of purchase, if any, conflicting with of ours.
   
  2. Quotation
  The quotation is valid for a period of thirty days unless extended.
We reserve the right to alter the design and weight to be in conformity with the technical progress.
Mistakes that are due to printing, arithmetical and calculation, which are apparent shall not give rise to any claim for compensation and will not create any obligation.
   
  3. Price
  Prices quoted are ex-works Coimbatore. The prices do not include packing, taxes, others levies and freight charges with are as follows –
Packing charges are subjected by 2%.
Sales Tax: As applicable at the time of delivery. Sales Tax concession from should accompany the purchase order (if concession rate of VAT/CST has availed)
Freight Charges: Freight to pay. However, if small consignments are sent through RPP or Courier, Such charges will have to be prepaid.
All other Taxes and levies and shall be borne by the purchase prices and terms are subject to change without any notice. The price ruling at the time of dispatch will apply.

   
  4. Mode of Dispatch
  Unless otherwise specified, by RPP and/or by lorry only. Dispatches by courier can be made but only if specified by the client, who should also indicate the name of the courier. However, HIFIT shall bear no responsibility for the quality of such services. Dispatches by VPP are not acceptable.
   
  5. Delivery Time
  We shall endeavor to keep the schedule delivery dates. The delivery period commences from that point of time, when all the technical and commercial details have been clarified.
If some clarifications are required the delivery period commences from the date such clarifications reach us. Unless otherwise specified part deliveries are permitted. Traffic bottlenecks dearth of Unforeseen events, whether in our works or in the third party undertakings on which the manufacture and transportation of the object of supply material depend and up springs, strikes action by Public Authorities, act of God  and raw material and energy of water , fire , which release us from the Obligation to adhere to the delivery dates provided we notify such events without delay.
   
  6. Payments
  Unless differently agreed in writing by us, payment shall be made by the way of demand payable at Coimbatore demand Draft payable at Coimbatore HIFIT shall bear only their bank charges.
The amount invoiced has to be paid within 10 days after the documents have been presented by the bank. Beyond this term, an interest, as prevailing at the time of sales be charged.
For non-standard, 50% of the purchase price (Non-interested bearing) must be paid when placing the order. For our technical book full advance by demand Draft is required.
   
  7. Transit Insurance
  Our responsibility ceases as soon as material is handed over to the transporter/postal authority/road carrier. We will entertain no claim for loss, damage in transits or short delivery. To cover all such risks the insurance of all such material in transit is to be arrange transit insurance at an extra cost. In the event of any shortage of any shortage, damage buyer should inform us for the same within 48 hours of receipt of material, or to make contra deductions, because of possible counter claims.
   
  8. Demurrage
  All demurrage charges incurred by reason of non- clearance of materials from transporter after arrival of same at destination for any other reason shall be borne by buyer
   
  9. RISK TRANSFER AND ACCEPTANCE:
  Risk is transferred to the ordering party upon dispatch, in part or full, from our works in Coimbatore.
   
  10. Reservation of ownership rights
  HIFIT shall have a general lien on all goods for the time being in possession and the property of the goods, not pass to the buyer until completion of payment of all outstanding amounts, present or future arising of the business relationship with the purchaser, irrespective of legal arguments.
   
  11. Warranty
  Applicable as per manufactures assured warranty
   
  12. Impossibility, Delay, Contract Amendment
  The party placing the order may withdraw from the contract if we are not able to supply within the acknowledged delivery time. In case part deliveries have taken place, only the remaining portion can be cancelled.
   
  13. Claims for compensation for damages
  Under no circumstances we can accept penalties of any nature in case of delayed supply. We also shall not be liable for damages measured by loss of profit or product or consequential damages of any nature resulting wholly or partly from HIFIT, negligence, mistake, and misrepresentation.
   
  14. Place of Jurisdiction
  Legal Jurisdiction: No legal proceeding shall be taken to enforce any claim and so suit arising out of contract shall be instituted except in a court of competent jurisdiction located within the corporation limits of Coimbatore and in no other court.
   
 
Home | Contact |Site map | Terms & Conditions
Copyrights 2009 @ barcareindia.com Conceptualiazed & Hosted by S16